Lithuania

Non-Technical Executive Summary

Stakeholder's Engagement Plan

Annex 1.1: Planned publicity procedure for the PEA EIA

Annex 1.2 : Drawing of the Special Plan Current Condition

Annex 6 : Schedule of the Project

Environmental and Social Management and Monitoring Plan

EIA Programme (Scoping document)

The programme on assessment of the environmental impact by the planned economic activity (hereinafter referred to as the “EIA Programme“) has been prepared in accordance with the provisions of the Republic of Lithuania Law on Assessment of Impact on the Environment by Planned Economic Activities, taking guidance from the Regulations on the Preparation of an Environmental Impact Assessment Programme and Report approved by order of the Minister of Environment No. D1-636 of 23 December 2005 [11] as amended [12] and the Methodological Guidance on the Assessment of Impact On Public Health [13], and having regard to the specific characteristics of the planned economic activity. The EIA Programme contains background information on the PEA, current environment of the PEA and other general information. Furthermore, the EIA Programme outlines the structure of the EIA Report to be prepared later (by providing a draft content of the report), its methodological principles and subjects as well as methods to be employed in the evaluation.


Annex 1 - Drawing with Planned economic activity (1:50000)

 Environmental and Social Impact Assessment Report


(L-1 text part)

Annex 1: Drawing of the Special plan. Current condition

Annex 2a: Alytus region General Plan: Technical infrustructure

Annex 2b: Alytus region General Plan: Use od Land

Annex 2c: Alytus region General Plan: Nature

Annex 2d: Lazdijai region General Plan: Technical infrustructure

Annex 2e: Lazdijai region General Plan: Use od Land

Annex 2f: Lazdijai region General Plan: Nature

Annex 3: Drawing of the Conceptual Master Plan

Annex 4: Map of assessment of aspects influencing the OPTL sectors

Annex 5: Map of assessment of aspects influencing the OPTL sectors 2

Annex 6: Map of alternative corridors for OPTL

Annex 7: Alytus substation reconstruction site

Annex 8: Schematic geologic representation of Quaternary deposits

Annex 9: Schematic geologic representation of Pre-Quaternary deposits

Annex 10: Map of distribution of water-bearing layer

Annex 11: Planned publicity procedure for the PEA EIA

Annex 12: Results of the area building-up density analysis

Annex 13a: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lden)

Annex 13b: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Levening)

Annex 13c: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lnight)

Annex 13d: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation overlimit value mathematical modeling of noise emissions (Lnight)

Annex 13e: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lday)

Annex 13f: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation overlimit value mathematical modeling of noise emissions (Lden)

Poland

General Project Introduction and EIA Scoping document

Attachment No 1: Decision of the Regional Director for Environmental Protection in Bialystok setting the scope of Environmental Impact Assessment report

Attachment No 2: Decision of the Regional Directorate for Environmental Protection in Bialystok on obligation of transboundary impact assessment

Attachment No 3: Information of General Directorate for Environmental Protection on completion of transboundary consultations regarding EIA