Documents
Lithuania
Non-Technical Executive Summary
Stakeholder's Engagement Plan
Annex 1.1: Planned publicity procedure for the PEA EIA
Annex 1.2 : Drawing of the Special Plan Current Condition
Annex 6 : Schedule of the Project
Environmental and Social Management and Monitoring Plan
EIA Programme (Scoping document)
The programme on assessment of the environmental impact by the planned
economic activity (hereinafter referred to as the “EIA Programme“) has
been prepared in accordance with the provisions of the Republic of
Lithuania Law on Assessment of Impact on the Environment by Planned
Economic Activities, taking guidance from the Regulations on the
Preparation of an Environmental Impact Assessment Programme and Report
approved by order of the Minister of Environment No. D1-636 of 23
December 2005 [11] as amended [12] and the Methodological Guidance on
the Assessment of Impact On Public Health [13], and having regard to the
specific characteristics of the planned economic activity. The EIA
Programme contains background information on the PEA, current
environment of the PEA and other general information. Furthermore, the
EIA Programme outlines the structure of the EIA Report to be prepared
later (by providing a draft content of the report), its methodological
principles and subjects as well as methods to be employed in the
evaluation.
Annex 1 - Drawing with Planned economic activity (1:50000)
Environmental and Social Impact Assessment Report
(L-1 text part)
Annex 1: Drawing of the Special plan. Current condition
Annex 2a: Alytus region General Plan: Technical infrustructure
Annex 2b: Alytus region General Plan: Use od Land
Annex 2c: Alytus region General Plan: Nature
Annex 2d: Lazdijai region General Plan: Technical infrustructure
Annex 2e: Lazdijai region General Plan: Use od Land
Annex 2f: Lazdijai region General Plan: Nature
Annex 3: Drawing of the Conceptual Master Plan
Annex 4: Map of assessment of aspects influencing the OPTL sectors
Annex 5: Map of assessment of aspects influencing the OPTL sectors 2
Annex 6: Map of alternative corridors for OPTL
Annex 7: Alytus substation reconstruction site
Annex 8: Schematic geologic representation of Quaternary deposits
Annex 9: Schematic geologic representation of Pre-Quaternary deposits
Annex 10: Map of distribution of water-bearing layer
Annex 11: Planned publicity procedure for the PEA EIA
Annex 12: Results of the area building-up density analysis
Annex 13a: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lden)
Annex 13b: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Levening)
Annex 13c: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lnight)
Annex 13d: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation overlimit value mathematical modeling of noise emissions (Lnight)
Annex 13e: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation mathematical modeling of noise emissions (Lday)
Annex 13f: Alytus transformers substation reconstruction and extension of the DC converters, and new 400 kV substation overlimit value mathematical modeling of noise emissions (Lden)
Poland
General Project Introduction and EIA Scoping document
Attachment No 1: Decision of the Regional Director for Environmental Protection in Bialystok setting the scope of Environmental Impact Assessment report
Attachment No 2: Decision of the Regional Directorate for Environmental Protection in Bialystok on obligation of transboundary impact assessment
Attachment No 3: Information of General Directorate for Environmental Protection on completion of transboundary consultations regarding EIA