Non-Technical Executive Summary |
|
Stakeholder's Engagement Plan |
|
Annex 1.1: Planned publicity procedure for the PEA EIA
|
|
Annex 1.2 : Drawing of the Special Plan Current Condition
|
|
Annex 6 : Schedule of the Project
|
|
Environmental and Social Management and Monitoring Plan |
|
EIA Programme (Scoping document)
|
 |
|
The programme on assessment of the environmental impact by the planned economic activity (hereinafter referred to as the “EIA Programme“) has been prepared in accordance with the provisions of the Republic of Lithuania Law on Assessment of Impact on the Environment by Planned Economic Activities, taking guidance from the Regulations on the Preparation of an Environmental Impact Assessment Programme and Report approved by order of the Minister of Environment No. D1-636 of 23 December 2005 [11] as amended [12] and the Methodological Guidance on the Assessment of Impact On Public Health [13], and having regard to the specific characteristics of the planned economic activity. The EIA Programme contains background information on the PEA, current environment of the PEA and other general information. Furthermore, the EIA Programme outlines the structure of the EIA Report to be prepared later (by providing a draft content of the report), its methodological principles and subjects as well as methods to be employed in the evaluation.
|
|
|
Annex 1 - Drawing with Planned economic activity (1:50000)
|
 |
| |
|
Environmental and Social Impact Assessment Report
(L-1 text part)
|
|
Graphic annexes |
|
| Annex 1: Drawing of the Special plan. Current condition |
|
| Annex 2a: Alytus region General Plan: Technical infrustructure |
|
Annex 2b: Alytus region General Plan: Use od Land
|
|
Annex 2c: Alytus region General Plan: Nature
|
|
| Annex 2d: Lazdijai region General Plan: Technical infrustructure |
|
| Annex 2e: Lazdijai region General Plan: Use od Land |
|
| Annex 2f: Lazdijai region General Plan: Nature |
|
| Annex 3: Drawing of the Conceptual Master Plan |
|
Annex 4: Map of assessment of aspects influencing the OPTL sectors
|
|
Annex 5: Map of assessment of aspects influencing the OPTL sectors 2
|
|
Annex 6: Map of alternative corridors for OPTL
|
|
Annex 7: Alytus substation reconstruction site
|
|
Annex 8: Schematic geologic representation of Quaternary deposits
|
|
Annex 9: Schematic geologic representation of Pre-Quaternary deposits
|
|
Annex 10: Map of distribution of water-bearing layer
|
|
Annex 11: Planned publicity procedure for the PEA EIA
|
|
Annex 12: Results of the area building-up density analysis
|
|
Annex 13a: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation mathematical modeling of noise emissions (Lden)
|
|
Annex 13b: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation mathematical modeling of noise emissions (Levening)
|
|
Annex 13c: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation mathematical modeling of noise emissions (Lnight)
|
|
Annex 13d: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation overlimit value mathematical modeling of noise emissions
(Lnight)
|
|
Annex 13e: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation mathematical modeling of noise emissions (Lday)
|
|
Annex 13f: Alytus transformers substation reconstruction and extension of the DC converters,
and new 400 kV substation overlimit value mathematical modeling of noise emissions
(Lden)
|
|