Energy interconnection
between Lithuania and Poland

Tender information

 
  • Announcement of the procurement: Consultancy services for Technical Design and Construction Permit for reconstruction and extension of 330 kV switchyard of Alytus 330/110/10 kV substation  (GA011A-06)

 
 2011 11 23 Explanation of the notice  
 2011 11 10 Explanation of the notice  
 2011 10 05 Explanation of the notice  
 2011 09 28 Repeated Invitation for Expression of Interest  
 2011 08 12 Explanation of the notice  
 2011 08 08 Explanation of the notice
 
 2011 08 03 Invitation for Expression of Interest (summary)
 
 
  • Announcement of the procurement: Consultancy services for Legal support in LitPol Link’s procurement activities (GA011A-04)

 
 2011 05 13 Explanation of the notice  
 2011 05 12 Explanation of the notice  
 2011 05 09 Explanation of the notice  
 2011 05 03 Invitation for Expression of Interest   
 
  • Announcement of the public procurement: Obtaining a building permit for a double circuit 400 kV line Elk - Polish border

 
 2011 06 13 Note on the selection of the best offer  
 2011 04 28 Terms of Reference - contents explanation  
 Attachement 1 - question 115  
 Information for Tenderers
 
2011 04 21 Terms of Reference - contents explanation  
 Attachement 1 - question 16
 
 Attachement 2 - question 18  
 Attachement 3 - question 113  
 Land plots schedule - question 105
 

2011 04 18 Amendment to Terms of References.

Changing the date of submission and opening of tender offers.

 
  2011 03 11 - Invitation for Expression of Interest (Polish version only)  
 Full version of the document is available in Polish language here
 
 
  • Announcement of the non -public procurement: Preparation of a Project of the report on the environmental impact assessment together with the biodiversity investigations for the construction of the 400 kV connection Ełk-Republic of Poland’s border and the reconstruction of the Ełk substation


 
 2010 05 07 - Announcement of the non-public procurement (Polish version only)

   
  • Preparation of Financial and Operational Model for the Project

 

 2009 11 24 - Invitation for Expression of Interest (pdf).

 
   
  • Consultancy services for feasibility study, technical documentation and territorial planning for reconstruction and extension of the Alytus substation with a back-to-back converter station (GA011-03)

 

   

 2009 10 13 - “The procedure of preparing special plan for building Lithuania-Poland power interconnection has started” (en, pdf)

 

 2009 06 12 - Invitation for Expression of Interest (en, pdf)

 

   
  • Consultancy Services for Preparation of territorial planning and environmental impact assessment (EIA) procedures and documents for the 400 kV overhead power transmission line between Alytus substation – border of the Republic of Poland (GA011-02)

 

 2009 06 03 - Invitation for Expression of Interest (en, pdf)

 
   
  • Preparation of the location study for the Polish side of the investment: “Construction of the double-circuit 400 kV power line Ełk – border of the Republic of Poland”

 

 2009 04 29 - Invitation for Expression of Interest